AURELIA, CHIKA (2023) ANALISIS PRODUKTIVITAS PT TORABIKA EKA SEMESTA MENGGUNAKAN METODE OBJECTIVE MATRIX (OMAX) DAN FAULT TREE ANALYSIS (FTA). Masters thesis, UNIVERSITAS MA CHUNG.
|
Text
05 411910016_Abstract (Bahasa Inggris).pdf Download (10kB) | Preview |
|
|
Text
10 411910016_Bab 1.pdf Download (137kB) | Preview |
|
|
Text
11 411910016_Bab 2.pdf Download (346kB) | Preview |
|
Text
12 411910016_Bab 3.pdf Restricted to Registered users only Download (367kB) |
||
Text
13 411910016_Bab 4.pdf Restricted to Registered users only Download (1MB) |
||
|
Text
14 411910016_Bab 5.pdf Download (33kB) | Preview |
|
|
Text
15 411910016_Daftar Pustaka.pdf Download (86kB) | Preview |
Abstract
PT Torabika Eka Semesta is a company producing healthy drinks and food. The existence of factories and various products certainly requires effectiveness and efficiency at work. The productivity level in the company is quite good, as seen from the achievement of the output target from January to December 2023 above 80%. The achievement of the output target can be caused by several things, such as
off-production machines, delays in starting production, and output fluctuations. The purpose of doing productivity analysis is to discover the problems that affect
productivity.The productivity analysis uses three methods: the Objective Matrix (OMAX), the Fault Tree Analysis (FTA), and the Analytical Hierarchy Process (AHP). The OMAX method is designed to calculate productivity values. The FTA
method is used to identify how a problem can occur at the highest level in a system. The AHP method is used to calculate the weighting of each indicator. The results of the AHP method obtained values of 0.1888, 0.4121, 0.1252,
0.1728, 0.1011 for indicator 1 to indicator 5 respectively. Then, using the OMAX method, the productivity values of 1.640, 1.415, 6.665, 5.548, 2.371, 1.716, 2.227,
2.470, 2.089, 1.387, 1.591, 1.396 were obtained from January 2022 to January2023. Based on the calculation results, it is known that defect/rework output, machine stop time and late start of production are indicators that have deficient
performance. Implementation was performed by attaching a "Cello Replacement Instructions" sticker to the machine. The implementation results showed an increase in productivity value in January by 1.613.Keywords: Analysis of roductivity, Objective Matrix Method, Fault Tree Analysis Method, Analytical Hierarchy Process.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | TUGAS AKHIR |
Subjects: | T Technology > T Technology (General) |
Divisions: | Fakultas Teknologi dan Desain > S1 Teknik Industri |
Depositing User: | Surya |
Date Deposited: | 19 Dec 2024 02:26 |
Last Modified: | 19 Dec 2024 02:26 |
URI: | http://repository.machung.ac.id/id/eprint/663 |
Actions (login required)
View Item |